1 \subsection{Preflight checklist
}
3 Before actual certification is commenced we perform a manual test using a checklist.
4 If any of the checks fail we immediately reject the product.
7 \item Is the product complete?
8 \item Does the product come with a manual or quick start guide?
9 \item Is it possible to get the product in a usable state?
10 \item Can we use the product to initiate a connection in a corruption
15 \textbf{DIT MOET VERANDERD WORDEN, HET PRODUCT ZOU AFGEKEURD WORDEN!
}
17 \subsection{Manual testing of SUT
}
19 The following requests are taken into considering while constructing test cases.
22 \item Single valid request.
23 \item Single invalid request with.
25 \item Corrupted checksum.
26 \item Corrupted payload with.
28 \item Oven number of bits flipped.
29 \item Odd number of bits flipped.
31 \item Corrupted source address.
32 \item Corrupted destination address.
34 \item Multiple valid requests received in order.
35 \item Multiple valid requests received out of order.
36 \item Mixed valid and invalid requests with.
38 \item Missing packets.
39 \item Corrupted checksum.
40 \item Corrupted payload with.
42 \item Oven number of bits flipped.
43 \item Odd number of bits flipped.
45 \item Corrupted source address.
46 \item Corrupted destination address.
50 Above enumeration results in a total of $
14$ test cases.