\subsection{Exit criteria}
\label{sec:exitcriteria}
The testing will be complete and the SUT will pass if and only if all the
the SUT has to adhere to a specification of a computer-to-computer protocol and
therefore the impact of a defect in the system is very high.
-Other exit criteria can be schedule or cost limits. When these limits are
-reached the testing will terminate but there is no confidence in the quality of
-the product.
+Other exit criteria are schedule deadline and cost limits. When these limits
+are reached the testing will terminate but there is no confidence in the
+quality of the product.